Pit wall inspection
Goldfields pit · Eastern Goldfields
The geotechnical engineer wants the pit checked after the rain: tension cracks behind the crest, rockfall on the berms, seepage on the faces. Fly the wall from inside the pit, close enough to read each one, and keep clear of the face.
- Aircraft
- Inspection class
- Cameras
- RGB and zoom
- When
- Morning or midday, within 2 to 6 days
- Hand over
- A defect report
- Fee
- $700 plus $450 a wall
- Repeats
- Every 14 days
The brief and terms are from the game's own job. Fees are drafts.



















